Glossaria.net

Glossary Logistics / Term

Activation

In constraint management, the use of non-constraint resources to make parts or products above the level needed to support the system constraint(s). The result is excessive work- in-process inventories or finished goods inventories, or both. In contrast, the term utilization is used to describe the situation in which non-constraint resource(s) usage is synchronized to support the needs of the constraint.

Permanent link Activation - Creation date 2021-12-06


< Action Report Glossary / Logistics Active Inventory >