Glossaria.net

Glossary Logistics / Term

Engineering Change Order (ECO)

A documented and approved revision to a product or process specification.

Permanent link Engineering Change Order (ECO) - Creation date 2021-12-06


< Engineering Change Back Glossary / Logistics Enroute >