Average elapsed time, in calendar days, between the time a regenerated forecast is accepted by the end-product manufacturing/assembly location, and the time that the revised plan is reflected in the Master Production Schedule of all the affected internal sub-assembly/component producing plant(s). (An element of Total Supply Chain Response Time).