Glossaria.net

Glossary Logistics / Term

Plan Stability

The difference between planned production and actual production, as a percentage of planned production.

Calculation: [(Sum of Monthly Production Plans) + (Sum of the absolute value of the difference between planned and actual)]/[Sum of Monthly Production Plans].

Note: Base Production Plan is the three month removed plan.

Permanent link Plan Stability - Creation date 2021-12-06


< Plan Source Glossary / Logistics Planned Date >