Glossary Logistics / Term
Average lead-time from the time manufacturing begins to the time end products are ready for shipment, including the following sub-elements: order configuration verification, production scheduling, time to release order to manufacturing or distribution, and build or configure time. (An element of Order Fulfillment Lead Time).
Note: Determined separately for Make-to-Order, Configure/Package-to-Order, and Engineer-to-Order products. Does not apply to Make-to-Stock products.