Glossary Logistics / Term
The number of days required to complete manufacture and delivery of an unplanned sustainable 20% increase in end-product supply of the predominant product line. The one constraint that is estimated to be the principal obstacle to a 20% increase in end-product supply as represented in days is Upside Flexibility: Principal Constraint. Upside flexibility can affect three possible areas: direct labor availability, internal manufacturing capacity, and key components or material availability.
Permanent link Upside Production Flexibility - Creation date 2021-12-06