Glossary Oil and Gas Field Operations / Term
The highest pressure calculated to be encountered at the surface of the well. Typically, the "anticipated surface pressure" prediction is obtained by subtracting the hydrostatic pressure exerted by a column of given fluid within the wellbore from the static reservoir pressure. However, the "maximum anticipated surface pressure" prediction assumes that the hydrostatic pressure is derived only from a column of dry gas within the wellbore acting against the static reservoir pressure.
Permanent link Maximum Anticipated Surface Pressure - Creation date 2020-06-07