Glossary Quality Control / Term
A series of techniques pioneered by Shigeo Shingo for changeovers of production machinery in less than 10 minutes. The long-term objective is always zero setup, in which changeovers are instantaneous and do not interfere in any way with continuous flow. Setup in a single minute is not required, but used as a reference (see “one-touch exchange of dies,” “internal setup” and “external setup”).
Permanent link Single-minute exchange of dies - Creation date 2021-06-27