Glossary Quality Control / Term
A precise description of each work activity, specifying cycle time, takt> time, the work sequence of specific tasks and the minimum inventory of parts on hand needed to conduct the activity. All jobs are organized around human motion to create an efficient sequence without waste. Work organized in such a way is called standard(ized) work. The three elements that make up standard work are takt time, working sequence and standard in-process stock (see individual listings).
Permanent link Standard work - Creation date 2021-06-27