Glossary Renewable energy / Term
At a hydroelectric plant, this term refers to the length of time required for a reservoir to collect a volume of water sufficient to reach useful capacity, i.e. the volume of water needed for the plant to operate normally.
Permanent link Reservoir fill time - Creation date 2021-10-28