Glossaria.net

Glossary Residential Construction / Term

Backout

Work the framing contractor does after the mechanical subcontractors (Heating-Plumbing-Electrical) finish their phase of work at the Rough (before insulation) stage to get the home ready for a municipal frame inspection. Generally, the framing contractor repairs anything disturbed by others and completes all framing necessary to pass a Rough Frame Inspection.

Permanent link Backout - Creation date 2021-03-05


< Backing Glossary / Residential Construction Ballast >