Glossaria.net

Glossary Supply Chain / Term

engineering change order (ECO)

A formal document that has been signed off by the affected departments and authorizes product definition changes to a drawing, bill of material or routing. It often ties to system planning, scheduling and cost functions by specifying an effectivity date for the items included.

Permanent link engineering change order (ECO) - Creation date 2021-11-03


< engineer to order (ETO) Glossary / Supply Chain engineering change request >