Glossary Supply Chain / Term
The period of time in an existing production schedule, normally the MPS, when changes are not allowed due to the impact on lower level items already in process and on vendors. It usually starts with the current date and extends into the future as far as required based on lead time. The same logic is also sometimes used in vendor scheduling.
Permanent link firm zone - Creation date 2021-11-03