Glossaria.net

Glossary Supply Chain / Term

low level code

A numerical code that specifies the lowest level a given item exists on any bill of material in the system. MRP processing logic gathers gross requirements from all successively-lower levels in the bill of material until the lowest level is reached before netting against inventory and incoming receipts to generate net requirements.

Permanent link low level code - Creation date 2021-11-03


< lot tracking Glossary / Supply Chain lower control limit (LCL) >