Glossary Supply Chain / Term
The requirements for an item based on its gross requirements (from forecasts, customer orders or upper level demand), minus stock already on-hand and scheduled receipts. If the total is below the specified safety stock, a planned order is generated based on the lot size. The generation of a new planned order for a given net requirement is normally done only after calculating the effect of rescheduling all incoming receipts to the dates required.
Permanent link net requirements - Creation date 2021-11-03