Glossaria.net

Glossary Supply Chain / Term

setup time

The total time required to change settings and tooling from one production run to another. Minimizing setup time is a key factor in reducing lot sizes and thus lead time, and has the goal of converting internal activities (those that require the resource to be idle) to external activities (those that occur while usable production is still occurring).

Permanent link setup time - Creation date 2021-11-03


< setup Glossary / Supply Chain seven wastes >