Glossaria.net

Glossary Wind Energy / Term

Energy Pay-Back

Period The amount of time it takes for a WT to generate as much energy is required to make the WT in the first place, install it, maintain it throughout its lifetime and, finally, scrap it(typically two to three months at a site with reasonable wind exposure).

Permanent link Energy Pay-Back - Creation date 2023-02-21


< Emissions Glossary / Wind Energy Energy payback >