Glossaria.net

Glossary Wind Energy / Term

Levellised Costs

The present-day average cost per kWh produced by the turbine over its entire lifetime, including all costs (investments, reinvestments and operation and maintenance costs). The levellised costs are calculated using the discount rate and the turbine lifetime.

Permanent link Levellised Costs - Creation date 2023-02-21


< Learning Rate Glossary / Wind Energy Lift >