Glossary Quality / Term
A four-step process for quality improvement. In the first step (plan), a way to effect improvement is developed. In the second step (do), the plan is carried out. In the third step (check), a study takes place between what was predicted and what was observed in the previous step. In the last step (act), action should be taken to correct or improve the process.
Permanent link Plan-do-check-act (PDCA) cycle - Creation date 2020-07-09